(1)
Mohammed, A. S.; Alwan, A. H.; Hassoun, I. O. Building a Cost Function Model to Compare the Efficiency of the Serial Sampling Plan and the Single Sampling Plan in Qualitative Control.
Al-adab J. 2021,
2 (138), 423-430.
https://doi.org/10.31973/aj.v2i138.1750.